Location: Subzone No. 3
Project cost: 9.1 billion tenge
Priority type of activity (OKED): Production of electrical wiring and electrical devices
(OKED 27.3 - Manufacture of electrical wiring and electrical installation devices)
Production of electric motors, generators, transformers, electrical distribution and control equipment
(OKED 27.11 - Production of electric motors, generators and transformers,
OKED 27.12 - Production of electrical distribution and control equipment)
Manufactured products: Cable products, electrical equipment
Contact address: resulov_samir014@mail.ru