Location: Subzone No. 4
Project cost: 102 billion tenge
Priority activity (OKED): Electricity generation by thermal power plants
(OKED 35.11.1 - Production of electricity by thermal power plants)
Electric power transmission
((OKVED 35.12.1 - Transmission of electricity)
Distribution of electricity
(OKED 35.13.0 - Electricity Distribution)
Manufactured products: Combined-cycle power plant with a capacity of 80 MW to cover the needs of the project for the construction of a Data center, followed by a phased increase in capacity to 250 MW
Contact address: dsr@uk-kip.com