Location: Subzone No. 3
Project cost: 300 million tenge
Priority type of activity (OKED): Production of other non–metallic mineral products: (OKED 23.61.2 – Production of wall blocks, OKED 23.69.0 - Production of other products made of concrete, construction gypsum and cement)
Manufactured products: Aerated concrete blocks
Contact address: b.intymakov87@mail.ru