Location: Subzone No. 1
Project cost: 16.1 billion tenge
Priority type of activity (OKED): Metallurgical industry
(OKED 24.20.0 - Production of pipes, tubes, hollow profiles, fittings made of steel)
Manufactured products: Pipes with gas-tight threaded connection of premium class.
Contact address: skulchikov@tenaris.com
sbaltayeva@tenaris.com